Repairing probes equipment hall – Ploieşti, Prahova County
Project description: The strength structure of the hall is made up of metal posts and farms.
Project description: The strength structure of the hall is made up of metal posts and farms.
Project description: Rehabilitation and extension of water and sewer lines, new waste water treatment plant in Predeal, Brasov County. General design, assistance and technical advice.
Project description: New water storage reservoir with a capacity of 5000 m3 in Zimnicea. General design, assistance and technical advice.
Project description: The strength structure of the hall is made up of metal posts and farms.
Project description: General design, assistance and technical advice.
Project description: The production hall has a resistance structure consisting of pillars, beams and reinforced concrete floors. The administrative body has a resistance structure made up of pillars, beams and reinforced concrete slabs.
Project description: General design, assistance and technical advice.
Project description: Architecture and structure design, technical assistance and advice.
Descriere proiect: Strength structure of the production hall is made up of glass foundations, pillars and precast reinforced concrete beams. Strength structure of the office building is made up of pillars, beams and reinforced concrete floors.
Project description: Architecture and structure design, technical assistance and advice.